71
likes
1
comments
daily view 0
monthly view 0
Live Analytics
Comments 0
Concrete Well Pipe Lowering: Construction Technology of Water Well with Bamboo Woven Filter Layer Analytics Table
Income Estimates for Concrete Well Pipe Lowering: Construction Technology of Water Well with Bamboo Woven Filter Layer
Based on this YouTube video's total view count of 28.5K views and industry-standard rates, the estimated total earning is $20 - $57 through ad revenue. Historical data is not yet available to calculate daily, weekly, or monthly averages.
About Concrete Well Pipe Lowering: Construction Technology of Water Well with Bamboo Woven Filter Layer
Explore Concrete Well Pipe Lowering: Construction Technology of Water Well with Bamboo Woven Filter Layer with 28,544 views, 71 likes, and 1 comments. Experience the impact of this video content that has captured audience attention.
This video shows the lowering operation of 400mm concrete well pipes. The pipes are wrapped externally with a bamboo woven filter layer to allow water infiltration and block sediment. This is a common technique for agricultural water supply wells in Xinjiang. š ļø On-site Operation Key Points Level the trench base: Keep the base of the well pipe horizontal to prevent tilting and misalignment. Hoist into position: The crane lifts the well pipe protected by bamboo weaving. Workers guide and adjust its posture to avoid damaging the bamboo filter layer by impact. Align pipe ends: Keep them centered and straight with uniform gaps. The two pipe ends must not be offset. Offset joints easily lead to sand leakage and pump jamming later. Weld and fix pipe joints: Weld and lock the connection after alignment to maintain the integrity of the whole string of well pipes and prevent separation after lowering. š” Function of the bamboo woven layer: Groundwater flows into the pipe through gaps in the bamboo weave while sand is trapped. This prevents sand in well water from abrading water pumps, suitable for gobi sandy strata. ā ļø Construction Notes No heavy impact during hoisting. Damaged bamboo weaving will directly cause sand inflow and well collapse later. Pipe end gaps must be even. Misalignment increases lowering resistance and may result in pipe jamming in severe cases.
About YouTube Real-Time View Count
With SocialCounts.orgās view counter, track your YouTube videoās live view count and YouTube likes count in real time with fast, reliable updates.
Watch every YouTube video live view count rise with our real-time YouTube views trackerābuilt for accuracy and minimal delay.
Follow YouTube real time views as they happen, using our dedicated view counter for YouTube videos.
Get up-to-date live view count on YouTube and see real-time growth with SocialCounts.orgās smart tracking tools.
Embed Widget
Parameters:
fullscreen=true- Fullscreen countergraph=true- Live graph chartcounter=0/1/2- Select counter (0=likes, 1=views, 2=comments)
URL
Click to copy the embed URL to your clipboard

