1,089
likes
55
comments
daily view 0
monthly view 0
Live Analytics
Comments 0
G6911 ๐๏ธ EXTREME CLIFFSIDE INTERCHANGE | Fengjie, China Analytics Table
Income Estimates for G6911 ๐๏ธ EXTREME CLIFFSIDE INTERCHANGE | Fengjie, China
Based on this YouTube video's total view count of 71.1K views and industry-standard rates, the estimated total earning is $50 - $142 through ad revenue. Historical data is not yet available to calculate daily, weekly, or monthly averages.
About G6911 ๐๏ธ EXTREME CLIFFSIDE INTERCHANGE | Fengjie, China
Explore G6911 ๐๏ธ EXTREME CLIFFSIDE INTERCHANGE | Fengjie, China with 71,124 views, 1,089 likes, and 55 comments. Experience the impact of this video content that has captured audience attention.
๐ ๐๐ก๐๐๐ | ๐ฑ๐๐๐ฉ๐ช๐ง๐ | ๐ค๐๐ช๐ข๐๐ฃ๐๐ฉ๐ฎ ๐๐ง๐๐ซ๐๐ก ๐ฝ๐ก๐ค๐ ๐๐๐ค๐ช๐ฉ ๐ฅ๐๐ค๐ฅ๐ก๐, ๐๐ช๐ก๐ฉ๐ช๐ง๐, ๐ฉ๐๐ ๐๐๐๐ช๐ฉ๐ฎ ๐ค๐ ๐๐๐ง๐ฉ๐ ๐ ๐ฌ #TravelVlog #Nature #NepalCreator โโจ@vlgruon โ G6911 Anlai Expressway (ๅฎๆฅ้ซ้) | Fengjie Kuimen Interchange (ๅฅ่ๅค้จไบ้) & Fengjie East Hub Interchange (ๅฅ่ไธๆข็บฝไบ้) ๐ Fengjie County, Chongqing, China ๐จ๐ณ ๐ Yangtze River ยท Three Gorges ยท Qutang Gorge Towering elevated ramps, sweeping highway curves and massive concrete piers weave through the dramatic cliffs of the Three Gorges. This strategic interchange connects important regional expressway routes and strengthens transport links around Fengjie. ๐ฅ This aerial footage captures: - Multi-level elevated interchange ramps - Curving highway connections across steep terrain - Tall viaduct piers and mountain road infrastructure - The surrounding Yangtze River valley and bridge network ๐๏ธ PROJECT ENGINEERING DETAILS ๐ฃ๏ธ Expressway: G6911 AnkangโLaifeng Expressway ๐ FengjieโWushan section: approximately 48.4 km ๐ Road standard: four lanes, 80 km/h design speed ๐ Planned bridges: 22 ๐ Planned interchanges: 6 ๐ ฟ๏ธ Planned service areas: 1 โฐ๏ธ Bridge and tunnel ratio: approximately 88% ๐ Construction timeline - Target completion and opening: end of 2026 - September 2026 reported progress: approximately 89% ๐ฆ Latest interchange update | November 2026 The Kuimen Interchange's full-direction ramps and relocated toll station resumed operation on September 29, 2026. The wider FengjieโWushan expressway project remained on its end-of-2026 completion target in the latest progress reports. ๐ข Project owner: Chongqing Fengjian Expressway Co., Ltd. Individual construction contractors and the exact heights or spans of the structures in this footage have not been independently confirmed. ๐ High-quality urban development Improved expressway connections support regional mobility, tourism access, logistics, economic cooperation and more balanced development across the ChongqingโHubei border region. #ๅฎๆฅ้ซ้ #G6911Expressway #Fengjie #ChinaInfrastructure #HighwayEngineering #MountainInterchange #CliffsideHighway #MegaEngineering #ChongqingChina #AerialEngineering
About YouTube Real-Time View Count
With SocialCounts.orgโs view counter, track your YouTube videoโs live view count and YouTube likes count in real time with fast, reliable updates.
Watch every YouTube video live view count rise with our real-time YouTube views trackerโbuilt for accuracy and minimal delay.
Follow YouTube real time views as they happen, using our dedicated view counter for YouTube videos.
Get up-to-date live view count on YouTube and see real-time growth with SocialCounts.orgโs smart tracking tools.
Embed Widget
Parameters:
fullscreen=true- Fullscreen countergraph=true- Live graph chartcounter=0/1/2- Select counter (0=likes, 1=views, 2=comments)
URL
Click to copy the embed URL to your clipboard

