Channel BannerChannel Banner
JIXzMmZweGIJIXzMmZweGI

New HS2 Birmingham bridge moved into final position

51,896
Socialcounts.Org
Enter Fullscreen (f)
893
likes
89
comments
daily view 0
monthly view 0

Share

Live Analytics

Comments 0

New HS2 Birmingham bridge moved into final position Analytics Table

Income Estimates for New HS2 Birmingham bridge moved into final position

Based on this YouTube video's total view count of 51.8K views and industry-standard rates, the estimated total earning is $36 - $104 through ad revenue. Historical data is not yet available to calculate daily, weekly, or monthly averages.

About New HS2 Birmingham bridge moved into final position

Explore New HS2 Birmingham bridge moved into final position with 51,896 views, 893 likes, and 89 comments. Experience the impact of this video content that has captured audience attention.

In a major construction operation, HS2 has moved a 1,600 tonne steel and concrete bridge into place in Saltley, Birmingham in just eight hours. The new Aston Church Road bridge, which is 84 metres long and 21 metres wide, was moved over the existing Birmingham to Derby railway line. It will also sit above the new HS2 tracks as high speed trains travel in and out of Birmingham. The bridge provides an upgraded, safer section of Aston Church Road including cycleways, which connects Saltley, Washwood Heath and Nechells in north-east Birmingham. The technique of building the structure on land next to the existing railway and moving it into position in one operation over one weekend, significantly minimises disruption to rail passengers. Heavy lifting engineering experts Mammoet moved the bridge into place using two 128-wheeled self-propelled modular transporters (SPMTs) across a matting bed put down over the tracks by Pod-Trak to provide a level surface. The bridge now sits on three structures - an abutment to the West of the existing rail tracks, a pier consisting of two columns on the East of the existing tracks, and an abutment to the East of the pier. Follow us on social media: Twitter: https://twitter.com/HS2ltd Instagram: https://www.instagram.com/hs2ltd/ Facebook: https://www.facebook.com/HS2ltd LinkedIn: https://www.linkedin.com/company/high-speed-two-hs2-ltd/ 0:00 Introduction 0:24 What has been completed? 0:57 Why is the bridge being built? 1:18 How was it constructed? 1:51 Design features 2:19 What’s next? 2:57 Final thoughts 3:19 Outro #HS2 #Construction #bridge #timelapse #birmingham #railway #engineering If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected].

About YouTube Real-Time View Count

With SocialCounts.org’s view counter, track your YouTube video’s live view count and YouTube likes count in real time with fast, reliable updates.

Watch every YouTube video live view count rise with our real-time YouTube views tracker—built for accuracy and minimal delay.

Follow YouTube real time views as they happen, using our dedicated view counter for YouTube videos.

Get up-to-date live view count on YouTube and see real-time growth with SocialCounts.org’s smart tracking tools.

Embed Widget

Parameters:

  • fullscreen=true - Fullscreen counter
  • graph=true - Live graph chart
  • counter=0/1/2 - Select counter (0=likes, 1=views, 2=comments)
URL

Click to copy the embed URL to your clipboard