84
likes
0
comments
daily view 0
monthly view 0

Share

Live Analytics

Comments 0

Rolling the Arch: How a Crew Pushes a Tunnel Trolley Along the Rails Analytics Table

Income Estimates for Rolling the Arch: How a Crew Pushes a Tunnel Trolley Along the Rails

Based on this YouTube video's total view count of 41.3K views and industry-standard rates, the estimated total earning is $29 - $83 through ad revenue. Historical data is not yet available to calculate daily, weekly, or monthly averages.

About Rolling the Arch: How a Crew Pushes a Tunnel Trolley Along the Rails

Explore Rolling the Arch: How a Crew Pushes a Tunnel Trolley Along the Rails with 41,394 views, 84 likes, and 0 comments. Experience the impact of this video content that has captured audience attention.

**Arch and Rail: The Mechanics of a Tunnel Trolley** A tunnel trolley—also called a mobile formwork or a tunneling shield—is a large steel arch that moves on rails. It is used to support the tunnel’s walls and roof while concrete is poured and cured. The trolley is built in sections, and its wheels ride on steel rails laid on the tunnel floor. The workers push the trolley forward by hand, using the rails as a guide. The structure is heavy—several tons—but the rails and wheels reduce friction, and the workers’ coordinated push moves it inch by inch. - **Trolley Type**: A steel arch formwork, with a curved roof and vertical sides. - **Weight**: The trolley weighs 5 to 20 tons, depending on the tunnel size. - **Wheels**: Steel wheels, 6 to 12 inches in diameter, running on steel rails. - **Rails**: The rails are laid on the tunnel floor, parallel and level. - **Push Force**: Three to five workers can push the trolley at 1 to 2 feet per minute. - **Coordination**: One worker calls the count, and the others push together. - **Safety**: Workers wear hard hats, gloves, and boots; the trolley can roll back if not chocked. - **Post-Push**: The trolley is locked in place with chocks and jacks before concrete is poured. When the trolley reaches its position, the workers chock the wheels and begin the concrete pour. The arch holds the form while the concrete sets. This is not a task that will appear in a construction manual; it is the heavy, coordinated work of a tunnel crew. And as the sun sets over the site, the workers know that the tunnel they are building will carry roads, water, or trains—thanks to an arch, a rail, and a team of steady hands.

About YouTube Real-Time View Count

With SocialCounts.org’s view counter, track your YouTube video’s live view count and YouTube likes count in real time with fast, reliable updates.

Watch every YouTube video live view count rise with our real-time YouTube views tracker—built for accuracy and minimal delay.

Follow YouTube real time views as they happen, using our dedicated view counter for YouTube videos.

Get up-to-date live view count on YouTube and see real-time growth with SocialCounts.org’s smart tracking tools.

Embed Widget

Parameters:

  • fullscreen=true - Fullscreen counter
  • graph=true - Live graph chart
  • counter=0/1/2 - Select counter (0=likes, 1=views, 2=comments)
URL

Click to copy the embed URL to your clipboard