
Washington-Dulles AeroTrain full ride
Published January 10, 2021
Views 12.8K | Likes 80 | Comments 9
At a glance
Views
12,892
Likes
80
Comments
9
Performance vs. channel
Outlier score
Engagement rate
More features coming
We're working on new analytics and tools. Stay tuned.
About
We are at the B Gates terminal of the Washington-Dulles AeroTrain, as we take a ride from this end of the line to the other end at C Gates. The entire ride takes about 7 minutes. The system opend back in 2010 and operates with Mitsubishi Crystal Mover vehicles. Enjoy the view from the front of the train. If you hav…
- Published
- January 10, 2021
- Made for kids
- No
More features coming
We're working on new analytics and tools. Stay tuned.